Stop in for a cup of coffee
I am going to attempt wiring in four overhead lights in the third bay of the shop. Not sure if the shoulder is ready for all the overhead work but I am going to make a run at it. Frankly I don’t care if I only do one a day! I already pre wired the switch in and have all the wire pulled to the box’s so literally just have to wire in the lights.