Swinging for Divorce…

Well I have only worked on this for maybe 1-2 hours a day, and 30 minutes of that is always trying to warm the shop up before starting lol. I also picked up a table saw, it makes cutting the boards so much easier.

It’s already holding temps better but it will get a lot better soon. I got some 2in board, a total of almost 40 boards between Menards and Lowe’s. Tomorrow I am going to pick up great stuff expanding insulation foam for between the foam boards.

I added some 6 MIL plastic over the rafters as well. I still have to get about 1/2 of the roof covered with plastic as well.

I’ll insulate the roof in the spring when I have installed new trusses.

I plan on putting OSB over the walls. For ac/heat I still have no clue. Maybe mini split with heat and ac, I’m not 100% sure yet. From what I have read on a 40x40 shop you need about 24-30k BTU mini split but they are supposed to be very energy efficient.

IMG_5950.jpeg

IMG_5961.jpeg

IMG_5971.jpeg