A couple reasons why I hate doing port work after others

Well I was lead to believe valves were being shipped last week but there was a miscommunication and they were waiting on springs at the end of the month to send everything. Big mistake as if I have the valves I can backcut the intake valves, do the valve job, blend the valve job in, finish the port and short side shaping, and flow test the heads. Plus I have another customer waiting to see the 2.08 results so he can order valves. I’m dead in the water on both these sets of heads till the end of the month because of springs but there’s lots of work needing done before I need the springs. I just got a UPS email saying valves may come tomorrow so hopefully some flow testing this week.