Swinging for Divorce…

The gap is closed halfway around the shop and I filled in the cracks on all of the boards. All I need to do now is put 14 boards up (1 wall), fill the big crack and then fill the gaps between the boards.

I’m debating if I should fill the gap all the way up to the point, or do I leave it for the air gap and circulation.

I’m not really sure lol.

With the air gap between the foam board and with OSB covering I should have about R11 or so; which isn’t to bad.

IMG_6071.jpeg