Well I got some stuff done. Transmission and new converter are back and installed. I was also able to finish the trunk intercooler lines to the new bulkhead fitting instead of just drilling holes through the floor. I also got trmhe line made for thr bulkhead to water pump out back.
Finally after 3 delays I received the rest of the 16an line to go from the pump to intercooler snd back to the ice box.
Injectors are back and going in as well. Hoping to fire back up this weekend.