we had the bathroom "remodeled" before we moved in, down to the the studs and floors joists. it twas a bit rotten. anyway, the closet is behind the shower/tub controls. I asked for that wall to be "Luan" panels and they are screwed to the studs. remove shelving, remove screws, panels out and everything is in the open. SOMETIMES, I plan ahead.