Stop in for a cup of coffee
Progress
Found that there are dimples in the firewall where the V8 plate attachment studs are.
Also, located the attachment point holes in the floorboard for the pedal pivot.
The indent on the plate matches the same point on the bulkhead connector.
Need to patch up the other trauma from the old pedal setup. Maybe tape the engine bay side and JB Weld the holes?