New Build Startup Issue

As 4spd mentioned, Install plug wires starting at the distributor cap post directly over the rotor and install clockwise from there 18436572.
I understand. But before I do so, my dist does not have any more CCW tuning left before it hits the hold down bracket.
Should I rotate the dist one tooth first?
Or, since the balancer is on 20 now, just rotate the dist CW to lineup more with the rotor?

IMG_4615.jpeg