After Jaxson checked in, I dove into working on the car. First, I knocked out the mid-plate frame mounts, then moved on to tackling the z-bar frame mount and got it welded in place. After that, I worked on the z-bar itself, which required extensive modifications. I finally got the pedal box reinstalled, so I could begin mocking up the linkage. The firewall will need a bit of adjusting for everything to operate smoothly, but I had to wrap it up for the night. On a side note, I’m pretty excited to get my hands on some Narragansett from back home – perfect for a victory beer!
Plus got the tubular core support back from the fab shop and the final stickers came from my buddy today