72 duster resto
Got the 8.8 in
Ordered and installed new 7.49" pushrods
Ordered and awaiting radiator, starter, clamps for 8.8 brake line, 8.8 vent and some other small things
Next on the list:
- 8.8 parking cable installation
- Brake lines installation and bleed
- Fill 8.8 with gear oil
Jump to engine work again
- Set valve lash on the engine
- Install intake
- Install carb
- Fill up torque converter and install
- Mate the trans and engine together
- Install engine mounts
Drop everything in the car
Then the fun continues!
I've been out for vacation, and a bunch of side work to fund the rest of the build so finally good to get some parts on order and get back in the garage here and there.