Adjusted the Valves again to make sure eveything was good, did some checking over of Valve Train etc. I mocked up the intake with the MP gaskets and all looked good. I put the silicone on everything and went to put the bolts in the intake and they didnt line up SOOOOOO I pulled everything back off and cleaned everything back up. Decided to measure the thickness of the gaskets and they were .075 thick. I had another pair of Mr. Gaskets for the intake so I measured them and they are .060, so Mocked it up again looked good so I re did the silocone and BAM it all went together. I am just about ready for the dyno. I will be making an engine dolly out of an engine stand using the lower portion of it toward the wheels so I can leave the headers on it for the trip on the road. I will try to get it done tomorrow.
Here is the engine as it sits now with everything just about done.
View attachment 113012
View attachment 113013