Ross' Aspen

Thanks Scott, you too.

If this job works out I want to get the swinger all wrapped up by this summer and the aspen at least figured out. That means about 2k more on the aspen and hopefully some paint work? I still have the bumper thing to finish and then build the valances but I think if I use swinger valances I can make it work. It's only metal lol