Found a place nearby to get some 20ga cold rolled steel. Will be able to practice tomorow with the welder. At about $6 a 12in x 24in piece, I will be able to trim it and practice until I get it right. The purists may think it's wrong to piece it like this, but I can't see spending all that money on a large piece when only a small piece is needed. IDK? The right way would be to replace the whole section, but I can't afford it now. Maybe later when I have the cash to spare I can get it done the REAL right way, but my way should be ok for now. Front valance primed, along with the left 1/4 panel. Thanks. Oh, the red you see in the one picture is the red shirt I was wearing.