67 Dart Build Triangulated 4 link & Mini Tub

Pictures of where I am at so far. This is ruffed in I still need to tap the metal around a bit before I weld it off. I will be welding the inner tub to the floor in the trunk area and then again in the wheel well along the frame rail. I will grind the frame rail area as flat as possible after welding.

I didn't need to patch the floor at all.

349 stroker etc 009.jpg

349 stroker etc 010.jpg

349 stroker etc 011.jpg

349 stroker etc 012.jpg

349 stroker etc 013.jpg

349 stroker etc 014.jpg

349 stroker etc 015.jpg

349 stroker etc 016.jpg

349 stroker etc 017.jpg

349 stroker etc 009.jpg

349 stroker etc 010.jpg

349 stroker etc 011.jpg

349 stroker etc 012.jpg

349 stroker etc 013.jpg

349 stroker etc 014.jpg

349 stroker etc 015.jpg

349 stroker etc 016.jpg

349 stroker etc 017.jpg