1966 Valiant Signet Convertible Resto

Got frame connectors in and now ready to powerclean the undercarriage and apply some evercoat to the bottom. The framerails went in nicely. Decided to stay away from the factory torque boxes and welded the tubing next to the frame rails. This also avoided capping and covering the framerail drain holes too. Not prefect but at least I didn't have to go up through the floorpans. As long as they function well I'm happy. Will post pictures tomorrow. :headbang: