The first two are my 273 back from the machine shop waiting for me to assemble it. I have spent the last 5-6 days at the beadblast cabinet and the last three are of some of the parts that are going to powdercoat tomorrow evening. I have five boxes of parts to do so we will see how it goes. Next will be sandblasting the K-frame & sway bar and selecting the proper paint for all the parts that will be painted instead of powdercoated. Cheers all8)