67Dart273
Well-Known Member
I figure, nowadays, I can do between 1/8 and 1/10 of a days work.......that I used to do......in a day
I've got parts of THREE days into this simple job. Part of one to hook up with and go jawbone and buy a set of used loading ramps, a good part of yesterday to rough it in, and today to finally finish it up. I HATE wading in cold water to launch a boat.
I could not just run it down the center, because if the rear is deep enough and the boat is afloat, the V of the bow actually will drag on such an installation
I've got parts of THREE days into this simple job. Part of one to hook up with and go jawbone and buy a set of used loading ramps, a good part of yesterday to rough it in, and today to finally finish it up. I HATE wading in cold water to launch a boat.
I could not just run it down the center, because if the rear is deep enough and the boat is afloat, the V of the bow actually will drag on such an installation