Dartswinger70
Well-Known Member
I have a set of J heads that are knurled with 2.02's. What equipment would I need to install bronze valve guide liners? Is it affordable or should I just drop them off at a machine shop?
I have no issues with a machine shop however the last set I dropped off took 6 weeks to 2 months to get the work done.
I have no issues with a machine shop however the last set I dropped off took 6 weeks to 2 months to get the work done.