moparmat2000
Well-Known Member
Well ya gots ta have a plan. In aviation sheetmetal repair, you have to figure out the order of dissassembly and reassembly, have a plan, figure out how each piece affects the others, etc. On my morning 2 mile run at 5am is when I think best. I have come up with a plan. After sandblasting and primer.
1. Install C pillar supports
2. Repair rust holes in lower rear window corners
3. Install rear window C channel
4. (temp) install dutchman
5. Install trunk torsion springs
6. Cut bracing back out.
7. Temp install trunk lid ( square it up to dutchman)
8. Use trunklid to align panel gaps for tops of quarters before welding
9. Weld quarter panel tops in.
10. Weld dutchman in.
1. Install C pillar supports
2. Repair rust holes in lower rear window corners
3. Install rear window C channel
4. (temp) install dutchman
5. Install trunk torsion springs
6. Cut bracing back out.
7. Temp install trunk lid ( square it up to dutchman)
8. Use trunklid to align panel gaps for tops of quarters before welding
9. Weld quarter panel tops in.
10. Weld dutchman in.
Last edited: