Muslca
Well-Known Member
I love the color!!!
I cant wait till the weather warms up so I can get back to work on this thing. Hoping to get the suspension and brakes done this year and maybe pick up a new engine harness to replace the junk used one I got screwed on.
I cant wait till the weather warms up so I can get back to work on this thing.
What? Come on it's not that cold!!
I can usually stay out in the garage for an hour or two before I realize that I'm starting to get frostbite.
The front suspension is next. Its all coming out. Every bushing in the car is dried out. I also have all new pre bent brake lines and will probably do the fuel lines. I also wont to change it to manual steering.
Good deal. Again, should take about 5 minutes to remove the whole front end while the engine is out. Get the t-bars out, unbolt the UCAs and the whole thing should come out as a unit with the K frame. Lot easier to deal with like that.
Good choice on the pre-bent lines. I actually bent my own front lines. What a hassle.
Dam...That car looks good at every angle. :glasses7: