Man you all have been busy, I am back have to order more of these snow stops, sucks. The roof is so long have to put some in the middle!
do they really work?Man I am going to have 142 of those things on the one section of roof!
I will have.You have a metal roof?
Have them install them when it goes on, it will prevent the snow from coming down at once, I am surprised the gutters did not get ripped off.I will have.
will do. we're looking at some of these, of course not to the expensive scale some of these are, but the generic look with a metal roofHave them install them when it goes on, it will prevent the snow from coming down at once, I am surprised the gutters did not get ripped off.
i'd just do what we did on the one barn, get a piece of 12 ft long aluminum angle iron, cut it into 4 foot sections and stagger itSome are really pricy. I scored some used antique ones a few years ago and put them on top of the porch. I have seen them from 1-40 each. I am trying the polycarbonate ones on this roof. 1.69 ea.
me? not deeply. scratched the surface. I'm dreading to learn what REMC is gonna charge to run the line about 200 feet from the road.You look into the wind generators yet?
Yeah. Not gonna b a mansion. I don't anticipate ever needing 3 phase either but just to connect a box at the road to run the electric fence for when I had cattle up there, they wanted 4500What is it just a small house on the property?
Did you guys see in Chicago a death certificate is ID to vote?
Heard the jokes, didn't know it to be trueSo can I vote, or do I have to wait to die first???
Do what I did in HI, 4" gal pipe 16' above ground prob only need one mine were 150' apart and ran my own wire, they wanted 12k to do it. I put the meter box on the first pole.Yeah. Not gonna b a mansion. I don't anticipate ever needing 3 phase either but just to connect a box at the road to run the electric fence for when I had cattle up there, they wanted 4500
Do what I did in HI, 4" gal pipe 16' above ground prob only need one mine were 150' apart and ran my own wire, they wanted 12k to do it. I put the meter box on the first pole.
Hey Carl , so you have to be dead to vote there?
What kind of wireDo what I did in HI, 4" gal pipe 16' above ground prob only need one mine were 150' apart and ran my own wire, they wanted 12k to do it. I put the meter box on the first pole.
Hey Carl , so you have to be dead to vote there?