Finally 95% Complete
30'x50' Hopefully looking to install 2 post lift and the usual compressor etc. Has a small room/office with full bath but I'm going to rip out the shower and just leave the toilet and sink. Lots of planning and work not to mention the siding is 3/4 treated $$$$. The back side structure was badly destroyed by termites so it was a tedious restructuring.Nice work!! Any plans on the inside?
How big is it? Looks like one hell of a stable for goodies
Yes, relocating the door to the center of the side wall with a 12x10 deck.Good job! It looks like a brand new building now. Did you take both of the man doors out?
Thanks Steve,Awesome job George!
The lean to was there but needs some attention.I think the eves' and lean too, were great idea.