Stop in for a cup of coffee

-
Think we cut 10 sheets of metal,made 25 misc lengths. That was all we could do. Too hot, humid. 28 foot panels are heavy,akward. Rest of it will be 2 tens and an eight. Shear is the ticket.i paid 300 for it, when all of it is cut,then its gone. Will sell it as i wont need it again. But sadly the price went up…guy i bought it from paid 450. Its worth it.
 
Took the entire interior out of the Jeep today, I’m 15 bucks worth richer.
 
I’m glad the carpet is indoor/outdoor rubberized. This think leaks like crazy
 
Rearranged the garage....

Hoist, press and tube destroyer moved to the back storage

20220710_182327.jpg
 
Went and mowed a couple acres. Lots of skeeters. Grass was taller than i thought. The tow behind sure makes it go a lot quicker,7 foot cut.
 
-
Back
Top