Done some work recently to the car, moving forward with a lot of things at the same time and upgrading even more stuff.
The dash is cleaned up (I'll give it a clean coat of paint later on too) and with a carbon fiber insert instead of the fake wood thing it came with...
I also lowered the rear a little bit to get a nicer fitment of my wheels.
Then I received my new fuel tank with integrated sender unit, inner baffles and AN fittings. I cutout the rear trunk floorpan to fit it in-between the frame rails with its own removable structure so I can easily drop the tank in the future if need be.
Then I finished the rollcage tubing and gussets all around the car.
Next was the egine break-in which I did in October last year. After that I tore the engine down to check everything, and install the final setup of double valve springs.
The dash is cleaned up (I'll give it a clean coat of paint later on too) and with a carbon fiber insert instead of the fake wood thing it came with...
I also lowered the rear a little bit to get a nicer fitment of my wheels.
Then I received my new fuel tank with integrated sender unit, inner baffles and AN fittings. I cutout the rear trunk floorpan to fit it in-between the frame rails with its own removable structure so I can easily drop the tank in the future if need be.
Then I finished the rollcage tubing and gussets all around the car.
Next was the egine break-in which I did in October last year. After that I tore the engine down to check everything, and install the final setup of double valve springs.