Well the last month and a half the Barracuda has been neglected.. Trying to get the 64 D100 road worthy for the summer. Pretty much re-wired the whole truck. Cleaned up the inside floor and seat and new rubber seals on almost everything. Defiantly leaning a few thing along the way that will come in handy on the 68.
The wiring was really bad. AMP gauge melted wire, scary..
Invested in a wall of wire. May try and make all new harness for the 68 after this.
Used some Eastwood Rust encapsulator Plus and really like the results.
Now June is Barracuda month. Need to get the paint striped and the car ready for body work and paint.
The wiring was really bad. AMP gauge melted wire, scary..
Invested in a wall of wire. May try and make all new harness for the 68 after this.
Used some Eastwood Rust encapsulator Plus and really like the results.
Now June is Barracuda month. Need to get the paint striped and the car ready for body work and paint.