Update !!! Got the drive train in the car. Also fuel and brake lines front to rear. Replaced the backing plates for 2 1/2 X 10 and installed the BBP Axles. All Em cables. All new brakes and hydraulics. Rear shocks installed. Fuel tank and trans lines and trans linkage will go in today. Anything I need to get done under the car while it is on the lift. Then I'll move it back to the upper resto bay to have the rest of the engine bay fitted out. Should have it running by next week.
Attachments
-
WIN_20151124_172403.jpg47.7 KB · Views: 686
-
WIN_20151202_163659.jpg33.8 KB · Views: 641
-
WIN_20151202_163642.jpg39.9 KB · Views: 630
-
WIN_20151202_163617.jpg33.1 KB · Views: 666
-
WIN_20151125_191951.jpg42.6 KB · Views: 630
-
WIN_20151125_145651.jpg42.4 KB · Views: 634
-
WIN_20151125_192234.jpg50.6 KB · Views: 607
-
WIN_20151125_192221.jpg54.3 KB · Views: 637
-
WIN_20151125_192311.jpg41.1 KB · Views: 659
-
WIN_20151125_131521.jpg38.8 KB · Views: 617