needsaresto
Well-Known Member
- Joined
- Nov 13, 2004
- Messages
- 7,603
- Reaction score
- 266
You forgot more pics,lol!
You forgot more pics,lol!
bkd Here here, MORE PICS lol
Looks Awesome! Do you have any pictures of the completed minitubs from the inside?
So MadDart,how many hours do you feel you have tied up in doing the minitub?I found it,s alot more work than it looks LOL.Now get the cage in!
P.S Don,t forget to cardboard up your windows when welding the cage in.Good Luck.
hey awsome build I have a 70 DUSTER that i have wanted to do this for some years now but have been scared to do it cause of no real write up till now. Dont know if this ? was asked but for those like me that have relocated the springs similar to what you did on the front leaf spring birch. can i use that for this setup? AM I ahead of the cam or do i have to start again by making a custom fab birch for those end links. Also would be much appreciated if you could send me the specs cant wait to dive into this one thanks and god bless
is there a reson for a fully welded fender? i was thinking about spot welding it and then using seam sealer. (thats how the factory does it) or does it need to be fully welded?
i get what your saying but im not cutting the tubs all the way to the rail im leaving the pince weld, and them bending it up and welding the inner fender to that. (ill have pics up later today)The frame rail is only 3 sided with the TOP of the rail using the Floor to box it in. Once you cut the inner fender out the floor will LIFT off the frame rail. Spot welds will not cure the problem there. Welding it off completely will stiffen it all up like Scott is saying.
I actually welded the floor back to the rail and then GRINDED it back down flush, then I installed the inner fender with the strip of metal, I tacked it in with screws and then scribed from the inside of the trunk along the floor pan on the back side of the INNER well. I then took it apart and cut the INNER well to that line, put it back in tack welded it all then FULLY welded inside the trunk area. I also went back into the wheel well and FULLY welded the from the outside also inside the wheel well. So I have 3 welding passes along the rail.
1) floor to frame rail after inner tub removal then grind flat
2) Inside trunk
3) Outside along rail again in the wheel well itself
i get what your saying but im not cutting the tubs all the way to the rail im leaving the pince weld, and them bending it up and welding the inner fender to that. (ill have pics up later today)
EDIT: i have the pics here at work too.....
yeah it just came to me as i was working on it. i figured why go and cut out the factory spot welds i just cut it out between them, and then ill weld up the spots that were cut out in between. i figure that it will have enough welding to hold the floors tight to the subframe as well as making it strong enough for the inner wheel well. only time will tell. as ill be sopt welding the fenders back in and then using seam sealer on them. ill have more pics after this weekend.(to be posted in my thread) i have about 3.5 hours in it at this point, and it took about 45 min to get it cut out. (took longer to remove the old body sealer to give the plasma room to actually cut the steel) this weekend (friday afternoon, saterday afternoon, all day sunday and monday) i hope to get the wheel tubs finished and the cage started, ideally i want the cage tacked in place so that the NHRA tech inspector can look at it to make sure that it will be ok and pass tech before we finish weld it. then its time to get the hemi installed.I see what you are doing now. This is the first time I have seen it done like that.